Roof Installation: What to Expect From Start to Finish

Most homeowners go through a roof replacement once or twice in their lives, so it is normal not to know what to expect. Here is what the process looks like from your side, from the first visit to the final walkthrough.

Not sure what shape your roof is in?

Free inspection scheduled within 24 hours. Free, with photos you keep.

The inspection and quote

It starts with someone on your roof and in your attic. They should photograph the condition of every slope, check the decking where they can, and look at ventilation. The quote that follows should spell out the shingle line, underlayment, flashing, ventilation work and the price per sheet for any decking that needs replacing.

If the replacement is going through insurance, the insurer's estimate sets most of the scope, and your contractor works from that.

Choosing materials

You will pick a shingle line and a color. A few tips:

  • Look at physical samples outside, in daylight, next to your brick or siding. Colors look very different on a screen.
  • Drive past a house that has the color you are considering.
  • Check your HOA's rules. Many North Texas neighborhoods limit colors or require approval before ordering.
  • Ask about impact-resistant shingles. They cost more but hold up better to hail and often earn an insurance discount.
  • Getting the house ready

    The day before installation:

  • Move cars out of the garage and driveway so the crew can get close
  • Take down wall hangings and fragile items on walls near the roof, since hammering vibrates the walls
  • Cover things stored in the attic, because some dust and debris will fall through
  • Plan for pets and small children, since it will be loud and there will be people on the roof all day
  • Mark sprinkler heads and anything in the yard you want protected
  • Installation day

    Crews usually start early to avoid the worst of the heat. The day goes roughly like this:

  • Tarps go down to protect landscaping, and a dumpster or trailer is placed
  • The old roof is torn off down to the decking. This is the loudest part.
  • Damaged decking is replaced
  • Drip edge, leak barrier and underlayment go down
  • New flashing, vent boots and ventilation are installed
  • Shingles and ridge caps go on
  • Most houses are done in one or two days. Larger or more complex roofs can take longer, and rain can push the schedule.

    Cleanup and walkthrough

    At the end, debris is hauled off and magnetic sweepers pick up nails from the yard, driveway and beds. You should get a walkthrough of the finished roof, photos, the final invoice, and your warranty paperwork.

    After the new roof

  • Keep the paperwork together: contract, invoice, warranty, permit and photos
  • Register the manufacturer's warranty if required
  • Keep gutters clean and trees trimmed back
  • Have the roof inspected once a year and after big storms
  • We walk every customer through these steps before work starts. Call (855) 741-ROOF to set up a free inspection.

    Get a free roof inspection

    No cost, no obligation, and a photo report you keep either way. If there is nothing wrong with your roof, we will tell you that.

    We answer or call back in under 15 minutes during business hours.

    Free inspection scheduled within 24 hours.

    Emergency tarping on site the same day.

    Prefer to talk to someone?(855) 741-ROOF

    Water coming in right now? We tarp same day.

    Want to pay monthly? See financing options.

    Preferred inspection window

    No obligation and no cost. We answer or call back in under 15 minutes during business hours. We never sell your information.

    Call NowFree Inspection